Ground-up residential construction
The situation
A residential builder controls an entitled site and needs acquisition and vertical-construction capital through completion.
MRC fit
A first-lien construction structure with progress-based draws tied to verified milestones.
Control points
- Third-party diligence
- ALTA lender title policy
- Inspector-verified draws
- Lien-waiver collection